Aeration blower installation, maintenance and operation optimization strategy
2025-05-22
During installation, it is necessary to ensure that the blower is horizontally fixed to the ventilation base, the air inlet reserves more than 1.5 meters of clearance to reduce the airflow resistance, and the air outlet pipe adopts a soft connection to buffer vibration. It is recommended to install