A guide to scientific installation and long-term maintenance of the 2BX Series Safety Valve
2025-04-27
During installation, it is necessary to follow the principle of "vertical priority and nearby layout", and give priority to the high point position close to the protected equipment to ensure that the discharge back pressure does not exceed 10% of the constant pressure value. If space